Purchase Procedure of Custom-Made Furniture

  • After choosing the right furniture package, you should settle the first deposit to confirm the date of on-site measurement and the schedule of design and delivery.
  • On-site measurement will be conducted by contractor to ensure the measurement accuracy.
  • The design layout would be completed in one to two weeks after on-site measurement.
  • After the verification of design layout, you should sign up for confirmation and keep a copy for future reference.
  • Furniture will be delivered approximately 5 weeks after the design layout confirmation; you have to clear the remaining balance after installation.